City of Kennewick Fire Department – Kennewick, WA

The City of Kennewick Fire Department elected to develop a new Fire Station # 5. After considerable planning and fund management the Kennewick Fire Protection District, at the direction of the City of Kennewick proceeded with a selected design and cost management program. The program provided a progressive long-term solution to the development of the first of two planned stations.Strategic Construction Management, Inc. provided program and construction management services and leadership that contributed to the Kennewick Fire Protection District reaching its goals.

Project Details

=

Owner

City of Kennewick Fire Department
PO Box 6108
Kennewick, WA 99336

=

Architect

TCA Architecture Planning
6211 Roosevelt Way N.E
Seattle, WA 98115

=

Contractors

Meridian Construction, Inc.
12730 E. Mirabeau Pkwy.
Suite 700
Spokane Valley, WA 99216-6108​